UNECA hereby seeks to pre-qualify a suitable Contractor who will study, design, supply, install and commission the Water Treatment Plant for Bore Hole Water located at United Nations Conference Center, Addis Ababa, Ethiopia. The treatment must provide four conventional stages of water treatment process Chlorination, PH Adjustment, Filtration and Reveres Osmosis.
To be short listed a contractor:
- must have past experience in designing, supplying and successful installation of Water Treatment Plant ;
- must have skilled labour and equipment available to perform the said work
- must have a product certification by renowned bureau of standards and product testing
Eligible contractor/s that can fulfill the above requirements will be invited to participate in the tender for supply, installation, and commissioning of the Water Treatment Plant for Bore Hole Water in a form of a Request for Proposal (RFP) wherein contained detailed requirements.
UNECA is precluded from entering into a contract with a firm that is not fully registered with UNECA. Those interested in responding to this invitation but not currently fully registered, as vendors with UNECA, are encouraged to register. Registration Form and “Vendor Response Form” could be downloaded from www.uneca.org/procurement or similar documents could also be collected from the UNECA, General Services Section, 2nd floor, Room no. 2N11. In order to be eligible for UN Registration, please make sure to declare in writing the Prerequisite for Eligibility criteria itemized from A-E as contained in EOI instruction attached.
Those interested should write to the above-mentioned e-mail address or fax number to submit their “expression of interest” by the deadline of 7 February 2012.
|